INFORMATION MANAGEMENT

ISO 19650-aligned information governance ensuring traceability, compliance and reliable data exchange across project teams.

01 Project Information Requirements

Establishing clear organisational and asset information requirements (OIR/AIR) that flow into project-level requirements (PIR/EIR). These define what information is needed, when, at what level of detail, and for what purpose.

Requirements are structured to support both delivery-phase coordination and operational handover, ensuring information has long-term value beyond construction.

02 BIM Execution Plan Configuration

The BEP is configured as a working reference document rather than a compliance formality. It defines modelling standards, responsibility matrices, software protocols, exchange formats and quality assurance procedures.

  • Responsibility matrix aligned to project roles and information deliverables
  • Model production delivery table (MPDT) with scheduled exchanges
  • Quality gate definitions for each project stage
  • Software and interoperability requirements

03 Common Data Environment Setup

CDE configuration follows ISO 19650-2 principles with clearly defined status codes, revision workflows and access permissions. The environment supports Work in Progress, Shared, Published and Archived containers with appropriate gate controls.

Folder structures are designed for scalability and consistent navigation across disciplines, with metadata schemas that support automated classification.

04 Naming Conventions & Classification

Naming conventions follow recognised standards such as BS EN ISO 19650 and Uniclass 2015 classification. Conventions cover files, models, drawings, documents and data objects with consistent field structures.

05 Data Validation Procedures

Automated and manual validation checks ensure incoming information meets defined requirements before acceptance. Checks cover naming compliance, geometric accuracy, data completeness, classification correctness and metadata integrity.